1E01 Inclusion
If the contractor’s AAPs are current, the Investigator will review the AAPs and Itemized Listing data to determine whether the contractor’s submissions include all requested information. To do so, the Investigator must first determine whether the contractor submitted all materials requested in the Scheduling Letter and Itemized Listing. Next, the Investigator must determine if the AAPs contain all the elements required by the regulations.
The elements of the required Executive Order AAP are listed in 41 CFR 60-2.10(b) while the required contents of Section 503 and VEVRAA AAPs are found in 41 CFR 60-741.44 and 60- 300.44, respectively.